Eberly Project

2008; Vienna, Virginia; 8 months construction time; in-house design.

This client visited the Grisius project [above] and hired us to do a similar “whole-house” renovation and enlarge the home with a big addition.

This was a 5-level home that presented huge design and construction challenges. We renovated every room in the home on all levels except one 12’ x 14’ room where the owners stayed during the renovation. On the exterior we raised the existing roof to a steeper pitch and added dormers to modernize the entire look. We added Hardi-Plank siding and blended it with the existing brick which we painted to match. We replaced all the windows and doors in the home and enlarged them when practical. We also finished the basement we added a cabana bath to serve the pool and created an open recreation. room overlooking the pool as well. The bedrooms on this level were upgraded as well. On the main level we re-did all the finishes [except the existing kitchen] including floors and trim. We converted the old 2-car garage to a two story great room with 2-story stone fireplace. We added a laundry and a 3-car garage with porte-cochere covered entry. On the upper level we gutted the area to the studs and combined some rooms to create a spectacular new master suite including a new master bath and walk-in closets. The other bath and bedrooms were re-done as well.